Monday, April 1, 2013

WYDOT Bridge work will starts April 2nd

The Wyoming Department of Transportation will be diverting traffic on Interstate 80, closing a section of US 191 and closing exit 99 starting today and through Thursday to continue work on the Flaming Gorge Road Project. Stephanie Harsha says the interruption will be during nighttime hours from 10 p.m. to 5 a.m., to limit traffic disruption.






Both directions of travel on Interstate 80 will be diverted during the nighttime hours. Traffic approaching from East and West will be moved onto the on and off ramps at exit 99. Speeds will be reduced to 30 miles per hour for traffic routed on to the ramps. Reduced speeds and delays are expected, but traffic will not be stopped on Interstate 80.






Traffic on US 191 South will be routed through the Sunset Drive Service Road. Travelers coming from the south on US 191 will be detoured into Rock Springs on Sunset Drive and onto the interstate from exit 102, Dewar Drive. For information on road closures and weather conditions, dial 511 or go to www.wyoroad.info.

No comments:

Post a Comment